Starship-Enterprises.Net

February 2002

The pictures on this set of pages are in 3D Stereo, with the pairs presented in parallel view first, then crosseyed view.

Area hand applied around east window without eyebrow (yet)

Hand packed areas SE wall of toilet and equipment room.

Some handpacked and some sprayed (from the inside) areas on bathroom wall.

The South facing back door, kitchen on right, sun room on left.

The Southwest facing 6'x8' window for the sun room.

Some hand packed, some sprayed from the inside.

Western wall of the "temporary bedroom" with Northwest facing window.

The western side of the dome, mostly sprayed on the lower six feet and hand applied above that.

March 3rd, ice from the dripping mixer.

The "widowmaker" shaft from the truck to the mixer, both on blocks.

A Western window with sprayed eyebrow.

The NW window of the "temporary bedroom" You can see the back door through it.

The Western window in the entry, for a built in desk.

The entry, partially sprayed and some hand applied.

View from water closet toward "temporary bedroom" through kitchen and sunroom.

View of the top pent and clerestory, which will have a 14"x48" window on each side, through the arch between the sunroom and the main dome area, which will later have two or three bedrooms and and a partial upper floor.

So now it's March 2002 and I'm making Progress. There have been some cold days but we are getting it done. Stay tuned...